Client project
Bunnings Alexandria - Heritage Steel Rectification
Overview
Doolee Construction was engaged to undertake structural steel corrosion rectification and protective coating works at the Bunnings Alexandria store in New South Wales. The scope comprised the remediation and recoating of corroded structural steelwork within the operational garden centre, delivered while the store remained fully open to the public.
Because the works were carried out within a live public retail environment, engineered scaffolding and full encapsulation were installed around the structural steelwork to provide safe access and isolate the work area from customers, staff and surrounding store operations. Industrial dust extraction and ventilation systems were integrated into the containment to maintain negative pressure and control dust, spent abrasive and airborne contaminants generated during blasting.
The existing coating system contained lead, requiring specialist hazardous-material controls throughout surface preparation. The steelwork was abrasive blasted to remove the existing coating, corrosion products and surface contaminants and to achieve the specified surface cleanliness and profile. Following blasting, a full inspection of the steel substrate identified areas where corrosion or damage had reduced structural integrity; a suitably qualified structural engineer designed an appropriate repair methodology for each area, which was then rectified by a coded welder.
On completion of all steel repairs, Doolee applied a three-coat Dulux protective coating system providing a total specified dry film thickness of 350 microns. A comprehensive QA/QC program was maintained throughout, and on completion all waste was removed for appropriate disposal before the containment and scaffold were dismantled and the affected areas reinstated for normal store operations.
Scope of work
- Access & Containment — Design and install engineered scaffolding and full encapsulation around the structural steelwork, incorporating industrial dust extraction and ventilation to maintain negative pressure and control dust, spent abrasive and airborne contaminants within the live retail environment.
- Hazardous Material (Lead) Controls — Implement specialist controls for removal of the existing lead-based coating, including full containment, respiratory protection and PPE, controlled hazardous waste management and disposal, and TSP air monitoring to verify containment and dust extraction effectiveness.
- Surface Preparation — Abrasive blast the structural steelwork to remove the existing coating, corrosion products and surface contaminants and achieve the specified surface cleanliness and profile.
- Structural Steel Repairs — Inspect the steel substrate to identify corrosion or damage affecting structural integrity, with an engineered repair methodology designed by a qualified structural engineer and rectified by a coded welder.
- Protective Coating Application — Stripe coat welds, edges, bolts and connections, then airless spray apply the three-coat Dulux system (Zincanode 402 at 75µm, Duremax MBE at 200µm, Weathermax HBR at 75µm) to a total of 350 microns DFT.
- QA/QC — Maintain environmental condition monitoring, visual inspections, and wet and dry film thickness testing throughout the works.
- Demobilisation & Reinstatement — Remove and dispose of all spent abrasive, coating debris and waste, dismantle the containment and scaffold systems, and reinstate the affected areas for normal store operations.
Challenges
- Live Public Retail Environment
Abrasive blasting and protective coating works were delivered within an operational Bunnings store and garden centre. Detailed staging, exclusion zones and controlled access arrangements were required to maintain safe separation between the works, customers, staff and ongoing retail operations.
- Lead Paint Removal
The existing coating system contained lead, requiring specialist hazardous-material controls during abrasive blasting. Full encapsulation, respiratory protection, controlled waste handling and TSP air monitoring were implemented to manage exposure and prevent the migration of lead-contaminated dust beyond the work area.
- Engineered Scaffold & Full Encapsulation
Engineered scaffolding provided access to the structural steelwork while supporting full encapsulation of the work zone. The scaffold arrangement was designed around the constrained retail environment and incorporated controlled pedestrian access where required to maintain store operations.
Highlights
- Dust Extraction & Environmental Controls Industrial extraction and ventilation systems were installed within the encapsulation to maintain negative pressure and capture airborne dust and contaminants generated during abrasive blasting, preventing their release into surrounding operational and public areas.
- Protective Coating System Following abrasive blasting, Doolee applied a three-coat Dulux protective coating system comprising Zincanode 402, Duremax MBE and Weathermax HBR to a total specified DFT of 350 microns, including stripe coating of welds, edges, bolts and connections.
- Comprehensive QA/QC & Environmental Monitoring A rigorous QA/QC regime was maintained throughout the works, incorporating environmental monitoring, visual inspections, wet and dry film thickness testing and progressive coating inspections, with project records compiled as part of the final handover documentation.